Build your dream home in this lovely community. As per Town, needs new septic, existing building must be removed and building size no larger than 1600 SF. Existing Cast Well, electricity, and cable on property. Oil tank removed. Oil spill cleaned as per NJDEP. Septic plans as per engineer can be made available. New Construction only.
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...